Resource Library

Welcome to our resource library. Here you can locate useful information to read online or download for later user. We include articles written by our engineers and regulatory specialists, job aids, case studies, links to view past webinars, presentation slides from our semi-annual user group meetings and other events.

Your search returned 8

This Electric Generation facility agreed to make extensive changes to reduce sulfur dioxide emissions during the same period they were preparing to comply with the Utility MATS rule.

8/27/2019

Sometimes a plant can get by, running with older equipment and software, but this Part 75 Appendix D power plant was feeling the pinch of getting too far out of date.

8/27/2019

An expansion project to build a large capacity urea plant and make improvements to the existing urea and ammonia plants included adding a Subpart Db Boiler.

7/31/2019

Two boilers at the mill were affected by the Boiler MACT Rule (40 CFR 63 Subpart DDDDD) reconsideration.

7/17/2019

Under a tight deadline, the goal was to set up OPC communication to StackVision and configure this Software-Only DAS to collect data, alarm on limits, and generate reports.

6/26/2019

It is more common than you may think for a refinery to fall under Part 75 rules, especially Ozone-only. And, with RSR on the way they used this as a test-run of moving to a DAS.

6/24/2019

CEMS data was moving from the DCS to the Manufacturing Execution System (MES), to the historian and finally to spreadsheets for environmental reporting. NSPS Subpart Ja forced a change.

6/22/2019

During this project five flares and a Sulfur Recovery Unit (SRU) were switched to using the ESC|StackVision data acquisition system (DAS) in time for the initial NSPS Subpart Ja deadline.

6/21/2019